Ozark Foothills Regional Planning Commission Projects

The below list encompasses past and present grants and projects in which the Ozark Foothills Regional Planning Commission secured and/or administered funding. 

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $31,683

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $25,000

Status: Current Project
Year: 2023
Funds Administered: $250,120

Status: Current Project
Year: 2023
Funds Administered: $306,000

Status: Current Project
Year: 2023
Funds Administered: $750,551

Status: Current Project
Year: 2023
Funds Administered: $630,454

Status: Current Project
Year: 2024
Funds Administered: $2,265,248

Status: Current Project
Year: 2024
Funds Administered: $1,637,201

Status: Current Project
Year: 2024
Funds Administered: $2,783,813

Status: Current Project
Year: 2024
Funds Administered: $740,700

Status: Current Project
Year: 2024
Funds Administered: $2,205,500

Status: Current Project
Year: 2024
Funds Administered: $1,808,658

Status: Current Project
Year: 2024
Funds Administered: $987,780

Status: Current Project
Year: 2023
Funds Administered: $181,800

Status: Current Project
Year: 2023
Funds Administered: $60,000

Status: Current Project
Year: 2023
Funds Administered: $60,000

Status: Current Project
Year: 2023
Funds Administered: $150,000

Status: Current Project
Year: 2023
Funds Administered: $260,280

Status: Current Project
Year: 2023
Funds Administered: $614,000 + $55,384

$55,384 added to original grant to act as gap funding. 

Status: Current Project
Year: 2022
Funds Administered: $500,000

Status: Current Project
Year: 2022
Funds Administered: $142,601 + additional $295,229.62 in Gap funding

$7,750.50 in additional funding added in early 2024.

Status: Current Project
Year: 2022
Funds Administered: $741,893

Grant Amendment awarded an additional $241,893 to the original $500,000 grant award. 

$10,078.80 in additional funding added in early 2024. 

Status: Current Project
Year: 2022
Funds Administered: $500,000

$59,717.84 in additional funding added early 2024. 

Status: Current Project
Year: 2022
Funds Administered: $189,802

Status: Current Project
Year: 2022
Funds Administered: $496,622

Status: Current Project
Year: 2022
Funds Administered: $487,774

Status: Current Project
Year: 2022
Funds Administered: $971,999

Status: Current Project
Year: 2022
Funds Administered: $198,428

Gap funding for new flooring received in fall 2023. $4,824 in additional funding secured. 

Status: Current Project
Year: 2022
Funds Administered: $363,619

Additional $2,733 added to original grant

Status: Current Project
Year: 2022
Funds Administered: $531,933

Amendment - $217,999.96 added to the original grant!

Status: Current Project
Year: 2022
Funds Administered: $927,071

$22,200 in additional funding received in fall 2023.

$15,066.59 in additional funding added in early 2024 for additional water meters. 

Status: Current Project
Year: 2022
Funds Administered: $426,208

Status: Current Project
Year: 2021
Funds Administered: $234,386 & $31,991 & $1,280.36 Additional

Status: Current Project
Year: 2021
Funds Administered: $499,931

Status: Current Project
Year: 2021
Funds Administered: $254,910

Status: Current Project
Year: 2021
Funds Administered: $226,914 & $24,294 Additional

Status: Current Project
Year: 2021
Funds Administered: $295,819

Status: Current Project
Year: 2021
Funds Administered: $316,072

Status: Current Project
Year: 2021
Funds Administered: $456,700

Status: Current Project
Year: 2021
Funds Administered: $177,599 & $163,976 Additional

Status: Current Project
Year: 2021
Funds Administered: $664,900

Status: Current Project
Year: 2021
Funds Administered: $50,000

$5,603 of Additional Funding Secured 

Status: Current Project
Year: 2021
Funds Administered: $39,600

Status: Past Project
Year: 2021
Funds Administered: $50,000

Status: Past Project
Year: 2021
Funds Administered: $50,000

Status: Past Project
Year: 2021
Funds Administered: $50,000

Status: Current Project
Year: 2021
Funds Administered: $61,120 & $132,060 Additional

Status: Current Project
Year: 2021
Funds Administered: $129,502 & $35,595

Status: Current Project
Year: 2021
Funds Administered: $118,926

Status: Current Project
Year: 2021
Funds Administered: $897,043

Status: Current Project
Year: 2021
Funds Administered: $50,000

Status: Current Project
Year: 2021
Funds Administered: $315,946

Status: Current Project
Year: 2021
Funds Administered: $701,824

Status: Current Project
Year: 2021
Funds Administered: $318,536

Status: Past Project
Year: 2021
Funds Administered: $19,142

Status: Current Project
Year: 2020
Funds Administered: $750,000

Status: Current Project
Year: 2020
Funds Administered: $131,250

Status: Current Project
Year: 2020
Funds Administered: $160,148

Status: Current Project
Year: 2020
Funds Administered: $45,126

Status: Current Project
Year: 2020
Funds Administered: $160,000

Status: Current Project
Year: 2019
Funds Administered: $500,000

Status: Current Project
Year: 2019
Funds Administered: $424,344

Status: Current Project
Year: 2019
Funds Administered: $4,562,876

Status: Past Project
Year: 2019
Funds Administered: $249,077

Status: Past Project
Year: 2019
Funds Administered: $318,126

Status: Current Project
Year: 2019
Funds Administered: $3,015,575

Status: Current Project
Year: 2019
Funds Administered: $3,757,233

Status: Current Project
Year: 2019
Funds Administered: $350,000

Status: Past Project
Year: 2019
Funds Administered: $34,969

Status: Current Project
Year: 2019
Funds Administered: $791,942

Status: Past Project
Year: 2018
Funds Administered: $336,900

Status: Past Project
Year: 2018
Funds Administered: $42,049

Status: Past Project
Year: 2018
Funds Administered: $65,440

Status: Past Project
Year: 2018
Funds Administered: $137,440

Status: Past Project
Year: 2018
Funds Administered: $373,364

Status: Past Project
Year: 2018
Funds Administered: $52,066

Status: Past Project
Year: 2018
Funds Administered: $250,000

Status: Past Project
Year: 2018
Funds Administered: $174,986

Status: Past Project
Year: 2018
Funds Administered: $65,440

Status: Current Project
Year: 2018
Funds Administered: $458,507

Status: Current Project
Year: 2018
Funds Administered: $85,914

Status: Past Project
Year: 2018
Funds Administered: $13,466

Status: Past Project
Year: 2018
Funds Administered: $30,000

Status: Past Project
Year: 2018
Funds Administered: $171,080

Status: Past Project
Year: 2018
Funds Administered: $210,343

Status: Current Project
Year: 2018
Funds Administered: $186,695

Status: Current Project
Year: 2018
Funds Administered: $116,665

Status: Current Project
Year: 2018
Funds Administered: $159,139

Status: Past Project
Year: 2017
Funds Administered: $39,200

Status: Past Project
Year: 2017
Funds Administered: $21,573.75

Status: Past Project
Year: 2016
Funds Administered: $286,345

Status: Past Project
Year: 2016
Funds Administered: $116,329

Status: Past Project
Year: 2016
Funds Administered: $385,945

Status: Past Project
Year: 2016
Funds Administered: $995,000

Status: Past Project
Year: 2015
Funds Administered: $1,420,000

Status: Past Project
Year: 2015
Funds Administered: $250,000

Status: Past Project
Year: 2014
Funds Administered: $240,474

Status: Past Project
Year: 2013
Funds Administered: $250,000

Status: Past Project
Year: 2013
Funds Administered: $500,000

Status: Past Project
Year: 2013
Funds Administered: $500,000

Status: Past Project
Year: 2012
Funds Administered: $50,000

Status: Past Project
Year: 2011
Funds Administered: $300,000

Status: Past Project
Year: 2011
Funds Administered: $500,000

Status: Past Project
Year: 2011
Funds Administered: $373,378

Status: Past Project
Year: 2011
Funds Administered: $342,938

Status: Past Project
Year: 2011
Funds Administered: $300,000

Status: Past Project
Year: 2011
Funds Administered: $336,927

Status: Past Project
Year: 2011
Funds Administered: $87,350

Status: Past Project
Year: 2011
Funds Administered: $111,060

Status: Past Project
Year: 2010
Funds Administered: $300,000

Status: Past Project
Year: 2010
Funds Administered: $97,170

Status: Past Project
Year: 2010
Funds Administered: $327,292

Status: Past Project
Year: 2010
Funds Administered: $300,000

Status: Past Project
Year: 2010
Funds Administered: $203,902

Status: Past Project
Year: 2010
Funds Administered: $299,384

Status: Past Project
Year: 2009
Funds Administered: $500,000

Status: Past Project
Year: 2009
Funds Administered: $120,200

Status: Past Project
Year: 2007
Funds Administered: $132,600

Status: Past Project
Year: 2007
Funds Administered: $393,500

Status: Past Project
Year: 2007
Funds Administered: $300,000

Status: Past Project
Year: 2006
Funds Administered: $42,000

Status: Past Project
Year: 2006
Funds Administered: $500,000

Status: Past Project
Year: 2006
Funds Administered: $125,000

Status: Past Project
Year: 2006
Funds Administered: $497,000

Status: Past Project
Year: 2006
Funds Administered: $268,220

Status: Past Project
Year: 2005
Funds Administered: $300,000

Status: Past Project
Year: 2009
Funds Administered: $100,000

Status: Past Project
Year: 2005
Funds Administered: $199,121

Status: Past Project
Year: 2004
Funds Administered: $242,000

Status: Past Project
Year: 2004
Funds Administered: $125,000

Status: Current Project
Year: 2022
Funds Administered: $24,471

Status: Current Project
Year: 2022
Funds Administered: $24,800

Status: Current Project
Year: 2022
Funds Administered: $14,303

Status: Current Project
Year: 2022
Funds Administered: $14,538

Status: Past Project
Year: 2021
Funds Administered: $10,000

Status: Past Project
Year: 2020
Funds Administered: $11,235

Status: Past Project
Year: 2020
Funds Administered: $2,400

Status: Past Project
Year: 2020
Funds Administered: $18,000

Status: Past Project
Year: 2019
Funds Administered: $15,000

Status: Past Project
Year: 2018
Funds Administered: $10,000

Status: Past Project
Year: 2013
Funds Administered: $4,500

Status: Past Project
Year: 2018
Funds Administered: $89,890

Status: Current Project
Year: 2024
Funds Administered: $15,000

OFRPC will develop the Qulin Active Transportation Plan

Status: Current Project
Year: 2024
Funds Administered: $15,000

OFRPC will develop the Poplar Bluff Active Transportation Plan. 

Status: Current Project
Year: 2023
Funds Administered: $876,000

Status: Current Project
Year: 2023
Funds Administered: $304,743

Status: Current Project
Year: 2023
Funds Administered: $72,500

Status: Current Project
Year: 2023
Funds Administered: $57,140

Status: Current Project
Year: 2023
Funds Administered: $402,392

Status: Current Project
Year: 2022
Funds Administered: $313,323

Status: Current Project
Year: 2021
Funds Administered: $139,549

Status: Current Project
Year: 2018
Funds Administered: $206,000

Status: Past Project
Year: 2018
Funds Administered: $250,000

Status: Current Project
Year: 2017
Funds Administered: $206,000

Status: Past Project
Year: 2017
Funds Administered: $144,615

Status: Past Project
Year: 2016
Funds Administered: $99,225

Status: Past Project
Year: 2015
Funds Administered: $106,000

Status: Past Project
Year: 2014
Funds Administered: $9,005

Status: Past Project
Year: 2014
Funds Administered: $100,000

Status: Past Project
Year: 2013
Funds Administered: $9,480

Status: Past Project
Year: 2013
Funds Administered: $7,481

Status: Past Project
Year: 2012
Funds Administered: $10,000

Status: Past Project
Year: 2012
Funds Administered: $200,000

Status: Past Project
Year: 2011
Funds Administered: $163,950

Status: Past Project
Year: 2011
Funds Administered: $10,000

Status: Past Project
Year: 2011
Funds Administered: $200,000

Status: Past Project
Year: 2010
Funds Administered: $435,140

Status: Past Project
Year: 2010
Funds Administered: $10,000

Status: Past Project
Year: 2010
Funds Administered: $200,000

Status: Past Project
Year: 2009
Funds Administered: $200,000

Status: Past Project
Year: 2009
Funds Administered: $157,359

Status: Past Project
Year: 2009
Funds Administered: $10,000

Status: Past Project
Year: 2008
Funds Administered: $10,000

Status: Past Project
Year: 2007
Funds Administered: $233,620

Status: Past Project
Year: 2006
Funds Administered: $57,580

Status: Past Project
Year: 2006
Funds Administered: $100,000

Status: Past Project
Year: 2004
Funds Administered: $100,000

Status: Past Project
Year: 2010
Funds Administered: $200,000

Status: Current Project
Year: 2023
Funds Administered: $210,000

Status: Current Project
Year: 2022
Funds Administered: $140,488.12

Status: Past Project
Year: 2020
Funds Administered: $210,000

Status: Current Project
Year: 2020
Funds Administered: $348,495

Status: Current Project
Year: 2020
Funds Administered: $246,444

Status: Past Project
Year: 2019
Funds Administered: $79,800

Status: Past Project
Year: 2019
Funds Administered: $70,000

Status: Past Project
Year: 2019
Funds Administered: $286,061

Status: Past Project
Year: 2019
Funds Administered: $

Status: Past Project
Year: 2018
Funds Administered: $96,800

Status: Past Project
Year: 2018
Funds Administered: $66,000

Status: Past Project
Year: 2018
Funds Administered: $500,000

Status: Past Project
Year: 2017
Funds Administered: $70,000

Status: Past Project
Year: 2016
Funds Administered: $66,000

Status: Past Project
Year: 2015
Funds Administered: $1,018,000

Status: Past Project
Year: 2015
Funds Administered: $61,000

Status: Past Project
Year: 2014
Funds Administered: $61,000

Status: Past Project
Year: 2013
Funds Administered: $54,900

Status: Past Project
Year: 2012
Funds Administered: $256,616

Status: Past Project
Year: 2012
Funds Administered: $61,000

Status: Past Project
Year: 2012
Funds Administered: $100,000

Status: Past Project
Year: 2011
Funds Administered: $76,000

Status: Past Project
Year: 2010
Funds Administered: $61,000

Status: Past Project
Year: 2010
Funds Administered: $80,000

Status: Past Project
Year: 2009
Funds Administered: $64,840

Status: Past Project
Year: 2008
Funds Administered: $51,000

Status: Past Project
Year: 2007
Funds Administered: $51,000

Status: Past Project
Year: 2006
Funds Administered: $54,000

Status: Past Project
Year: 2023
Funds Administered: $125,000

Status: Current Project
Year: 2023
Funds Administered: $36,551.66

Status: Current Project
Year: 2020
Funds Administered: $25,474.99

Status: Current Project
Year: 2020
Funds Administered: $25,801.96

Status: Past Project
Year: 2020
Funds Administered: $271,340

Status: Current Project
Year: 2019
Funds Administered: $487,594

Status: Current Project
Year: 2019
Funds Administered: $338,020

Status: Current Project
Year: 2019
Funds Administered: $353,128

Status: Past Project
Year: 2015
Funds Administered: $109,327

Status: Past Project
Year: 2013
Funds Administered: $30,256

Status: Past Project
Year: 2013
Funds Administered: #112,100

Status: Past Project
Year: 2012
Funds Administered: $173,029

Status: Past Project
Year: 2012
Funds Administered: $1,702,000

Status: Past Project
Year: 2012
Funds Administered: $393,046

Status: Past Project
Year: 2011
Funds Administered: $96,900

Status: Past Project
Year: 2010
Funds Administered: $43,425

Status: Past Project
Year: 2010
Funds Administered: $911,625

Status: Past Project
Year: 2008
Funds Administered: $39,000

Status: Past Project
Year: 2007
Funds Administered: $1,016,640

Status: Current Project
Year: 2020
Funds Administered: $291,134

Status: Past Project
Year: 2017
Funds Administered: $247,888

Status: Past Project
Year: 2015
Funds Administered: $126,176

Status: Past Project
Year: 2013
Funds Administered: $150,000

Status: Past Project
Year: 2012
Funds Administered: $150,000

Status: Past Project
Year: 2018
Funds Administered: $15,000

Status: Past Project
Year: 2018
Funds Administered: $20,000

Status: Past Project
Year: 2020
Funds Administered: $7,043.50

Status: Current Project
Year: 2019
Funds Administered: $150,000

Status: Current Project
Year: 2018
Funds Administered: $150,000

Status: Past Project
Year: 2017
Funds Administered: $150,000

Status: Past Project
Year: 2013
Funds Administered: $61,650

Status: Current Project
Year: 2023
Funds Administered: $300,000

Status: Current Project
Year: 2023
Funds Administered: $22,200

Status: Current Project
Year: 2023
Funds Administered: $178,000

Status: Current Project
Year: 2023
Funds Administered: $45,504.25

Status: Current Project
Year: 2022
Funds Administered: $1,165,709

Water Storage & Distibution Upgrades

Status: Current Project
Year: 2022
Funds Administered: $4,813,350

Well, Waterlines and Storage Tank

Status: Current Project
Year: 2021
Funds Administered: $250,000

$62,484 additional funding added in early 2024. 

Status: Past Project
Year: 2021
Funds Administered: $95,000

Status: Current Project
Year: 2021
Funds Administered: $42,000

Status: Current Project
Year: 2021
Funds Administered: $68,513

Status: Past Project
Year: 2021
Funds Administered: $142,400

Status: Past Project
Year: 2020
Funds Administered: $98,438

Status: Past Project
Year: 2020
Funds Administered: $89,466

Status: Past Project
Year: 2020
Funds Administered: $136,500

Status: Past Project
Year: 2019
Funds Administered: $26,321

Status: Past Project
Year: 2019
Funds Administered: $92,675

Status: Past Project
Year: 2019
Funds Administered: $140,000

Status: Past Project
Year: 2019
Funds Administered: $50,000

Status: Past Project
Year: 2018
Funds Administered: $74,500

Status: Past Project
Year: 2016
Funds Administered: $7,500

Status: Past Project
Year: 2016
Funds Administered: $98,288

Status: Past Project
Year: 2015
Funds Administered: $164,922

Status: Past Project
Year: 2015
Funds Administered: $76,300

Status: Past Project
Year: 2014
Funds Administered: $137,408

Status: Past Project
Year: 2013
Funds Administered: $102,594

Status: Past Project
Year: 2013
Funds Administered: $13,200

Status: Past Project
Year: 2012
Funds Administered: $97,023

Status: Past Project
Year: 2012
Funds Administered: $16,125

Status: Past Project
Year: 2011
Funds Administered: $71,913

Status: Past Project
Year: 2011
Funds Administered: $90,023

Status: Past Project
Year: 2010
Funds Administered: $22,745

Status: Past Project
Year: 2010
Funds Administered: $75,000

Status: Past Project
Year: 2010
Funds Administered: $97,800

Status: Past Project
Year: 2010
Funds Administered: $162,400

Status: Past Project
Year: 2009
Funds Administered: $390,400

Status: Past Project
Year: 2009
Funds Administered: $100,000

Status: Past Project
Year: 2008
Funds Administered: $199,640

Status: Past Project
Year: 2007
Funds Administered: $238,000

Status: Past Project
Year: 2006
Funds Administered: $40,000

Status: Past Project
Year: 2006
Funds Administered: $112,779

Status: Past Project
Year: 2012
Funds Administered: $56,900

Status: Past Project
Year: 2011
Funds Administered: $100,000

Status: Past Project
Year: 2008
Funds Administered: $$75,500

Status: Past Project
Year: 2008
Funds Administered: $76,400

Status: Past Project
Year: 2008
Funds Administered: $80,000

Status: Past Project
Year: 2006
Funds Administered: $99, 968

Status: Past Project
Year: 2006
Funds Administered: $294,014

Status: Past Project
Year: 2006
Funds Administered: $99,998

Status: Past Project
Year: 2006
Funds Administered: $42,818

Status: Past Project
Year: 2014
Funds Administered: $25,000

Status: Past Project
Year: 2014
Funds Administered: $37,400

Status: Past Project
Year: 2012
Funds Administered: $76,125

Status: Past Project
Year: 2012
Funds Administered: $50,000

Status: Past Project
Year: 2011
Funds Administered: $12,500

Status: Past Project
Year: 2010
Funds Administered: $12,500

Status: Past Project
Year: 2009
Funds Administered: $25,000

Status: Current Project
Year: 2024
Funds Administered: $120,000

Status: Current Project
Year: 2024
Funds Administered: $58,720

Status: Current Project
Year: 2024
Funds Administered: $50,010

Status: Past Project
Year: 2009-2016
Funds Administered: Varies Annually

Status: Past Project
Year: 2013
Funds Administered: $3,800

Status: Past Project
Year: 2012
Funds Administered: $4,811

Status: Past Project
Year: 2011
Funds Administered: $9,620

Status: Past Project
Year: 2010
Funds Administered: $14,432

Status: Past Project
Year: 2009
Funds Administered: $19,243

Status: Current Project
Year: 2023
Funds Administered: $197,335

Status: Current Project
Year: 2023
Funds Administered: $26,315.79

Status: Current Project
Year: 2021
Funds Administered: $1,540,020

Status: Current Project
Year: 2021
Funds Administered: $612,941

Additional $167,389.24 of Funding Secured. 

Status: Current Project
Year: 2021
Funds Administered: $237,162

To replace faulty equipment at lift stations #3 and #4

Status: Current Project
Year: 2020
Funds Administered: $15,000

Status: Past Project
Year: 2019
Funds Administered: $792,168

Status: Past Project
Year: 2017
Funds Administered: $157,264

Status: Past Project
Year: 2017
Funds Administered: $30,000

Status: Past Project
Year: 2017
Funds Administered: $67,025

Status: Past Project
Year: 2015
Funds Administered: $57,396

Status: Past Project
Year: 2014
Funds Administered: $65,170

Status: Past Project
Year: 2014
Funds Administered: $114,000

Status: Current Project
Year: 2024
Funds Administered: $300,784

Status: Current Project
Year: 2024
Funds Administered: $85,260.40

Status: Current Project
Year: 2023
Funds Administered: $500,000

Status: Past Project
Year: 2023
Funds Administered: $77,205.88

Status: Current Project
Year: 2022
Funds Administered: $77,205.88

Status: Past Project
Year: 2021
Funds Administered: $64,706

Status: Current Project
Year: 2021
Funds Administered: $375,273

Status: Past Project
Year: 2020
Funds Administered: $64,706

Status: Past Project
Year: 2019
Funds Administered: $64,706

Status: Past Project
Year: 2018
Funds Administered: $64,706

Status: Past Project
Year: 2017
Funds Administered: $64,706

Status: Past Project
Year: 2016
Funds Administered: $337,751

Status: Past Project
Year: 2016
Funds Administered: $64,706

Status: Past Project
Year: 2015
Funds Administered: $59,400

Status: Past Project
Year: 2014
Funds Administered: $58,824

Status: Past Project
Year: 2013
Funds Administered: $58,824

Status: Past Project
Year: 2012
Funds Administered: $252,000

Status: Past Project
Year: 2012
Funds Administered: $99,100

Status: Past Project
Year: 2012
Funds Administered: $233,750

Status: Past Project
Year: 2012
Funds Administered: $59,400

Status: Past Project
Year: 2011
Funds Administered: $183,243

Status: Past Project
Year: 2011
Funds Administered: $57,000

Status: Past Project
Year: 2010
Funds Administered: $76,375

Status: Past Project
Year: 2010
Funds Administered: $118,320

Status: Past Project
Year: 2010
Funds Administered: $56,640

Status: Past Project
Year: 2009
Funds Administered: $220,000

Status: Past Project
Year: 2009
Funds Administered: $55,355

Status: Past Project
Year: 2008
Funds Administered: $57,310

Status: Past Project
Year: 2007
Funds Administered: $39,000

Status: Past Project
Year: 2007
Funds Administered: $192,000

Status: Past Project
Year: 2006
Funds Administered: $214,650

Status: Past Project
Year: 2006
Funds Administered: $400,000

Status: Past Project
Year: 2006
Funds Administered: $109,000

Status: Past Project
Year: 2018
Funds Administered: $365,660

Status: Past Project
Year: 2023
Funds Administered: $7,680

Status: Past Project
Year: 2016
Funds Administered: $9,139.44

Status: Past Project
Year: 2013
Funds Administered: $8,981

Status: Past Project
Year: 2017
Funds Administered: $551,731

Status: Past Project
Year: 2012
Funds Administered: $66,897

Status: Past Project
Year: 2011
Funds Administered: $24,582

Status: Past Project
Year: 2011
Funds Administered: $24,582

Status: Past Project
Year: 2010
Funds Administered: $24,100

Status: Past Project
Year: 2009
Funds Administered: $23,700

Status: Past Project
Year: 2008
Funds Administered: $23,300

Status: Past Project
Year: 2007
Funds Administered: $22,830

Status: Past Project
Year: 2019
Funds Administered: $40,449

Status: Current Project
Year: 2022
Funds Administered: $24,000

Status: Past Project
Year: 2021
Funds Administered: $13,352

Status: Past Project
Year: 2020
Funds Administered: $13,351

Status: Past Project
Year: 2018
Funds Administered: $8,901

Status: Past Project
Year: 2017
Funds Administered: $8,901

Status: Past Project
Year: 2016
Funds Administered: $4,450.59

Status: Past Project
Year: 2015
Funds Administered: $4,450.59

Status: Past Project
Year: 2014
Funds Administered: $4,267.06

Status: Past Project
Year: 2013
Funds Administered: $15,000

Status: Past Project
Year: 2013
Funds Administered: $4,450.59

Status: Past Project
Year: 2012
Funds Administered: $4,450.59

Status: Past Project
Year: 2011
Funds Administered: $4,450.59

Status: Past Project
Year: 2010
Funds Administered: $7,983.52

Status: Past Project
Year: 2009
Funds Administered: $13,351.76

Status: Past Project
Year: 2008
Funds Administered: $13,351.76

Status: Past Project
Year: 2006
Funds Administered: $8,901.18

Status: Past Project
Year: 2016
Funds Administered: $843,297

Status: Current Project
Year: 2023
Funds Administered: $15,000

Status: Current Project
Year: 2020
Funds Administered: $50,000

Status: Past Project
Year: 2018
Funds Administered: $54,213

Status: Past Project
Year: 2018
Funds Administered: $10,000

Status: Past Project
Year: 2021
Funds Administered: $90,000

Status: Past Project
Year: 2020
Funds Administered: $90,000

Status: Past Project
Year: 2019
Funds Administered: $84,000

Status: Past Project
Year: 2018
Funds Administered: $81,675

Status: Past Project
Year: 2016
Funds Administered: $90,081

Status: Past Project
Year: 2015
Funds Administered: $154,318

Status: Past Project
Year: 2014
Funds Administered: $123,734

Status: Past Project
Year: 2013
Funds Administered: $14,000

Status: Current Project
Year: 2023
Funds Administered: $41,300

Status: Current Project
Year: 2023
Funds Administered: $47,200

Status: Past Project
Year: 2021
Funds Administered: $24,557

Status: Current Project
Year: 2020
Funds Administered: $75,000

Status: Past Project
Year: 2015
Funds Administered: $30,000

Status: Past Project
Year: 2012
Funds Administered: $324,000

Status: Past Project
Year: 2010
Funds Administered: $250,000

Status: Past Project
Year: 2010
Funds Administered: $47,000

Status: Past Project
Year: 2010
Funds Administered: $324,000

Status: Past Project
Year: 2009
Funds Administered: $29,000

Status: Past Project
Year: 2009
Funds Administered: $299,448

Status: Past Project
Year: 2009
Funds Administered: $14,100

Status: Past Project
Year: 2009
Funds Administered: $28,400

Status: Past Project
Year: 2011
Funds Administered: $298,334

Status: Past Project
Year: 2011
Funds Administered: $96,782

Status: Past Project
Year: 2011
Funds Administered: $294,784

Status: Past Project
Year: 2010
Funds Administered: $298,334

Status: Past Project
Year: 2006
Funds Administered: $100,000

Status: Past Project
Year: 2006
Funds Administered: $92,971

Status: Past Project
Year: 2006
Funds Administered: $97,542

Status: Past Project
Year: 2006
Funds Administered: $57,096

Status: Past Project
Year: 2005
Funds Administered: $185,390

Status: Past Project
Year: 2009
Funds Administered: $1,030,000

Status: Current Project
Year: 2024
Funds Administered: $116,000

Status: Past Project
Year: 2010
Funds Administered: $2,100,000

Status: Past Project
Year: 2009
Funds Administered: $1,900,000

Status: Past Project
Year: 2009
Funds Administered: $665,000

Status: Current Project
Year: 2022
Funds Administered: $51,436

Status: Past Project
Year: 2021
Funds Administered: $43,605

Status: Past Project
Year: 2020
Funds Administered: $43,605

Status: Past Project
Year: 2021
Funds Administered: $25,000

Status: Past Project
Year: 2021
Funds Administered: $21,784

Status: Past Project
Year: 2020
Funds Administered: $150,888

Status: Past Project
Year: 2020
Funds Administered: $61,851

Status: Past Project
Year: 2020
Funds Administered: $1,411,235

Status: Past Project
Year: 2020
Funds Administered: $49,310

Status: Past Project
Year: 2020
Funds Administered: $10,304

Status: Past Project
Year: 2019
Funds Administered: $43,605

Status: Past Project
Year: 2019
Funds Administered: $17,247

Status: Past Project
Year: 2018
Funds Administered: $36,946

Status: Past Project
Year: 2017
Funds Administered: $36,946

Status: Past Project
Year: 2017
Funds Administered: $1,200,000

Status: Past Project
Year: 2016
Funds Administered: $2,400

Status: Past Project
Year: 2016
Funds Administered: $39,358

Status: Past Project
Year: 2016
Funds Administered: $1,215,872

Status: Past Project
Year: 2016
Funds Administered: $34,213

Status: Past Project
Year: 2015
Funds Administered: $34,213

Status: Past Project
Year: 2015
Funds Administered: $45,458

Status: Past Project
Year: 2015
Funds Administered: $1,168,186

Status: Past Project
Year: 2015
Funds Administered: $54,495

Status: Past Project
Year: 2014
Funds Administered: $33,637

Status: Past Project
Year: 2014
Funds Administered: $33,637

Status: Past Project
Year: 2014
Funds Administered: $1,208,945

Status: Past Project
Year: 2014
Funds Administered: $45,570

Status: Past Project
Year: 2013
Funds Administered: $34.213

Status: Past Project
Year: 2013
Funds Administered: $1,126,538

Status: Past Project
Year: 2012
Funds Administered: $34,213

Status: Past Project
Year: 2012
Funds Administered: $869,487

Status: Past Project
Year: 2011
Funds Administered: $34,213

Status: Past Project
Year: 2011
Funds Administered: $1,166,220

Status: Past Project
Year: 2010
Funds Administered: $33,875

Status: Past Project
Year: 2010
Funds Administered: $1,254,671

Status: Past Project
Year: 2009
Funds Administered: $1,083,247

Status: Past Project
Year: 2009
Funds Administered: $33,540

Status: Past Project
Year: 2008
Funds Administered: $1,239,297

Status: Past Project
Year: 2008
Funds Administered: $33,208

Status: Past Project
Year: 2007
Funds Administered: $32,879

Status: Past Project
Year: 2007
Funds Administered: $1,014,033

Status: Past Project
Year: 2006
Funds Administered: $939,888

Status: Past Project
Year: 2005
Funds Administered: $932,470